Seguin Custom Cabinets logoSeguin Custom CabinetsSeguin, TX
Custom Kitchen Remodels photo

Seguin Custom Cabinets

Custom Kitchen Remodels in Seguin, TX

Full kitchen remodels in Seguin led by cabinetry design, build, and install. Free estimates for layout changes in older homes.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Seguin and nearby communities.

A lot of Seguin kitchens haven't been touched since the house was built, and the layout shows it: a cramped work triangle, no pantry, cabinets that stop short of the ceiling. Seguin Custom Cabinets runs full kitchen remodels built around new cabinetry, not just a cosmetic refresh on top of the old layout.

We coordinate design, demo, build, and install as one project so you're not juggling separate trades on separate schedules. If your remodel touches plumbing or electrical, we'll flag that early so lead times line up.

What's included

What's included with Custom Kitchen Remodels

Typically included: design consult, layout revision, demolition of existing cabinetry, new cabinet build and install, countertop coordination. Optional: under-cabinet lighting, integrated appliance panels, extended pantry or island storage. Customer prep: empty the kitchen fully before demo day and line up any separate countertop or appliance vendors in advance.

How it works

How our Custom Kitchen Remodels process works

  1. Initial Design Consultation photo
    Step 1

    Initial Design Consultation

    We review your goals and existing kitchen layout to plan the remodel.

  2. Space Planning photo
    Step 2

    Space Planning

    A revised floor plan is developed to improve workflow and storage.

  3. Demolition And Prep photo
    Step 3

    Demolition And Prep

    Existing cabinetry and fixtures are removed to prepare for new installation.

  4. Cabinetry Installation photo
    Step 4

    Cabinetry Installation

    New custom cabinets are installed according to the approved design.

  5. Countertop Integration photo
    Step 5

    Countertop Integration

    Countertops are fitted and aligned with the new cabinetry layout.

  6. Final Walkthrough photo
    Step 6

    Final Walkthrough

    We review the finished space with you to ensure every detail meets expectations.

Materials

Materials and methods for Custom Kitchen Remodels

  • Engineered Wood Panels photo

    Engineered Wood Panels

    A stable material used for cabinet construction in remodeled kitchens, resisting warping through humid Central Texas summers.

  • Custom Cabinet Doors photo

    Custom Cabinet Doors

    Doors designed to match the updated kitchen aesthetic.

  • Integrated Appliance Panels photo

    Integrated Appliance Panels

    Panels that conceal appliances for a smooth cabinetry look.

  • Under-Cabinet Lighting photo

    Under-Cabinet Lighting

    Lighting installed beneath cabinets to improve visibility and ambiance.

  • Hardware Finishes photo

    Hardware Finishes

    Coordinated hardware selected to unify the kitchen's new design.

  • Sealant Coatings photo

    Sealant Coatings

    Protective sealants applied to extend the life of cabinetry surfaces, especially useful where older plaster walls meet new cabinet runs.

Timeline

How long does a Custom Kitchen Remodels take?

A full remodel runs longer than a straight cabinet swap because demo, build, and coordination with other trades stack up.

  1. 01

    Design consult

    same day
  2. 02

    Design approval

    1–2 weeks
  3. 03

    Build time

    4–7 weeks
  4. 04

    Demo and install

    1–2 weeks

Need a schedule that fits?

Get a Free Estimate

Before & after

Before and after Custom Kitchen Remodels results

  • Custom Kitchen Remodels photo
    Before
  • Custom Kitchen Remodels photo
    After

FAQs

Custom Kitchen Remodels FAQs

How much does a full kitchen remodel cost in Seguin?

Cost scales with how much layout changes and whether plumbing or electrical moves. A cabinet-focused remodel without structural changes runs lower than one that relocates the sink or adds an island.

How far ahead should I schedule a remodel?

Order cabinets 4-6 weeks before you want to start demo so the build finishes close to when the old kitchen comes out, keeping your kitchen down time shorter.

Do I need a permit for a kitchen remodel?

Cabinet work alone usually doesn't need one. Moving plumbing, gas lines, or electrical as part of the layout change typically does, and we'll point that out during design.

Is DIY kitchen remodeling realistic?

Demo and painting are doable yourself. Coordinating cabinet builds with countertop templating and any trade work is where most DIY remodels stall out.

When should I call a pro instead of refacing?

If you're changing the layout at all, moving appliances, or adding a pantry wall, that's a remodel, not a reface, and needs a shop that can plan the whole sequence.

What's typically included in the remodel price?

Design time, demo, new cabinet build, install, and countertop coordination. Appliances and flooring are usually separate unless specified.

How do I prepare my kitchen for a remodel?

Clear out cabinets and countertops fully, and have a temporary setup for cooking since the kitchen will be unusable during demo and install.

Next step

Get a Custom Kitchen Remodels estimate in Seguin

Call (830) 406-4255 for a free design consult. Seguin Custom Cabinets will walk the space with you before any demo starts.

Ask about Custom Kitchen Remodels

Tell us about the project and how to reach you.

Call (830) 406-4255